Specializing in generator control equipment, whole plant solutions
中文
Customer Service Hotline:4001005853
Home
About
Business introduction
Management team
Organization Structure
Qualification honor
Product
Water turbine governing system
Generator excitation system
Monitoring and auxiliary control system
Microprocessor-based relay protection
Contact
Home
>
Product
>
监控及辅控系统
LDS-2000W Computer monitoring system in Waterworks
Summary
Contour drawing
Control chart
Parameter
Performance
Model selection
In the control room operator station using WINDOWS Chinese operating system, a dynamic multi window graphical display technology, the Chinese friendly interface, free configuration tool platform programming graphical development tool with powerful support and development, online editing, with remote network maintenance, diagnosis and expert services;
Using today's most advanced software technology development, to extend the software life cycle, protect user investment;
Built in SQL Server database, easy to integrate production data into the user enterprise management system;
Universal scripting language ANSI C/VBA, data structures and functions, simple and flexible functions;
Powerful standardized interfaces (such as OLE, ActiveX, and OPC) and open application interface API to facilitate the connection of third party software;
Water and external monitoring equipment interface is flexible, according to the actual situation, the electric cable, optical fiber, radio, GSM and other data transmission support the popular client / server architecture and Internet/Intranet browser technology;
Control network support network, dual network, single ring network and fully redundant loop network and other types;
The system structure of the FPGA controller + communication network + PC monitoring system, the controller selects international well-known brand PLC (such as Siemens, GE, AB, Schneider etc.), using advanced industrial Ethernet (Industrial Ethernet) and Fieldbus Technology (such as Profibus, Canbus, Modbus) for data transmission, so as to improve the transmission capacity of the system data and the reliability and real-time.
Meet relevant GB and industry standards;
Selection instructions;
Provide general layout plan, main process drawing and electrical wiring diagram of water plant;
Provides instructions for specific control objects;
Other requirements of the owner.
Water purification plant, sewage treatment plant and other automation control areas.
www.nengshida.com © Three Gorges nengshida electric Limited by Share Ltd