ACS200系列

In 1993, the first programmable microcomputer governor was developed in china;

In 1994, the first double regulation programmable microcomputer governor was put into operation in Guangxi Dahua Power Plant, and the AGC regulation function was realized for the first time in China. The provincial and ministerial level appraisal was carried out in the same year.

In 1996, developed the first domestic stepping type microcomputer governor;

In 1999, the first pumped storage power station was put into operation at Hubei paradise power station;

In 2003, it became the first manufacturer of large pumped storage unit governor in China, and developed PCC intelligent turbine governor;

In 2004, a large high-tech industrial turbine governor national base, and won the national development and Reform Commission special funds grants (industry only award); "national turbine governor industrialization base" listed on the electric;

In 2006, the speed control system of Baishan pumped storage power station, independently designed and manufactured, was put into operation successfully and became the first domestic manufacturer of Large Pumped Storage units;

In 2011, the MGC4000 speed regulator developed by our company was put into operation at the Three Gorges underground power station;

In 2014, the MGC4000 governor was put into operation in the same year as Xiangjiaba, Xiluodu and Jinping two;

In 2016, the company's main research and nengshida joint Huazhong University of Science and Technology, the Three Gorges group, Yangtze Power Units such as the declaration of the "large hydraulic turbine control system key technology, equipment and industrialization" project won the national science and technology progress prize two;